|

Acquaintance

At the first step, the client defines the goals and objectives of the future project and sets them out in the Brief. A questionnaire, where the answers determine the objectives of the development and the basic parameters of a future project, which allows estimating the budget.After all approvals, a contract for writing the terms of reference (TOR) is signed.

Image Description
Image Description

Discovery and Planing

After signing the contract, the project is assigned to a manager who will entirely oversee the project. On the basis of the requests described in the brief, the analysis of the customer’s area of activity, the target audience and their rivals, he or she creates TOR. A document describing all the works to the smallest detail. The terms of reference make it clear to the client what exactly will be done for an agreed budget. Busines Analyst makes the overall evaluation of the target market with regard to the project’s ideation. The specific requirements and features that become unique to the market are added to the TOR.

Prototyping

This is a process of creating conceptual designs. Schematic layouts of the structure of all the site pages, which display the most important basic elements of the interface. Schematic layouts allow to clearly show what each page was designed for, what information it needs, as well as to weed out unwanted elements. Well designed schemes greatly facilitate the work of the designer at the next step. The development of design layouts.

formulating ideas for the functional
  • developing scenarios of visitors’ behaviour
  • developing a clear and easy site structure, familiar to perception
  • constructing an intuitive interface
  • creating schematic layouts
  • implementing the project objectives
Image Description
Image Description

Layout design

Having the raw data, the design team develops a visual solution to the tasks set in the TOR using the patterns of the prototype. To make the graphical part fully meet the set tasks, each of the site elements should elicit the visitor associative array with the area of activity of our customer.

Programming

Having received the approved layouts, team lead of programmers delegates tasks across departments. Coders perform imposition layouts, transforming the design layout into html code. At the same time, the project team programs all required functional modules.

When everything is ready, programmers perform integration of the makeup in the system. The result is a product that is ready for testing.

Image Description
Image Description

Testing

After receiving the draft, the tester performs a complex of works aimed at identifying inconsistencies with the design layouts and/or the terms of reference. Additionally, it is tested by test cases, which is aimed at identifying possible problems with stability and security.

Additionally, the project manager tests it for compliance with the TOR.

Test results are sent to the team lead of programmers, who in turn delegate fixing the discovered problems to relevant specialists.

After fixing, the project returns to the testers, and only after their approval, as well as the approval of the Project Manager, it is located on the server to be shown to the customers.

Launch

After receiving confirmation of the full readiness of the project from the customer, we transfer the project to the customer’s server and configure all services. The project is brought up to 100% completion.

If necessary, we hold a presentation for the customer on the work with the control system and other developing services. Filling with content is conducted if so agreed.

After the completion of the project, the customer receives a product made in time and strictly compliant with the terms of reference, with a deep level of control at all steps.

Image Description